Turnaround Partner

BIS Production Partner undertakes responsibility for preparations, planning and execution of all or parts of a turnaround. A verification programme that measures the effect of preliminary activities, planning, implementation and completion ensures optimum results.

BIS Production Partner has developed a concept for implementation of "Best Practice" in planned shutdowns.

Verification

A verification programme that measures the effect of preliminary activities, planning, implementation and completion ensures that optimum results are achieved by all work processes. This applies to both the planned shutdown that is carried out and the next stop.

• Verifications prior to implementation secure and enhance the planned shutdown.
• Verification after the implementation is intended to improve later planned shutdown.

Joint project organisation

A cooperation with you as a customer in a joint project organisation is a prerequisite for a successful implementation of a planned shutdown .

Work processes and checklists

Together we analyse each individual sub-process that is included in the planned shutdown.
With the basis of descriptions and checklists as the reference point we examine each single element in all phases of the planned shutdown .

Important check elements are:

• Organisation
• Planning routines
• Control over scope
• Purchases and procurements
• HES
• Cost control
• Constant improvement
• Technical elements

Technical elements will be:

• Rotating equipment
• Valves
• Safety valves
• Heat exchangers
• Flange couplings before ‘start-up’ and leakage checks
• Tanks and containers

Best Practice

Together we develop the "Best Practice" for your planned shutdown. This will result in higher quality, better costcontrol and a shorter ‘time-out’ with existing and future planned shutdowns.